Skip to content
DOTES Tesarstvo Oražem
Timber construction

Bridge at Postojna Cave

In 2012 we renovated the dilapidated timber bridge leading to Postojna Cave.

Postojna · 2012COMPLETED WITH DOTES
Brief and solution

Drawing on many years of experience, we built a sturdy bridge, which is a necessity as it is frequently flooded. It required almost 20 cubic metres of larch wood, and we used stainless steel screws, which will ensure that the bridge serves its purpose for many years to come.

Location
Postojna
Year
2012
Building type
Infrastructure
Role of DOTES
Renovation of a larch timber bridge

Gallery

5
Let's start with a conversation

What are you planning?

Describe what you need — design, construction, a roof or timber processing. You can attach drawings and photos if you already have them.

Write to us or call us
info@dotes.si 01 836 48 10
DOTES d.o.o.
Obrtniška ulica 6
1331 Dolenja vas