Timber construction
Kočevje Secondary School
Repair of the school after a fire — timber platform and facade battens.
Brief and solution
After the fire, the preserved reinforced concrete part of the building was extended upwards with a lightweight steel and timber structure.
We built the timber platform of the multi-purpose room and the larch battens on the facade, combined with fibre cement panels.
- Location
- Kočevje
- Year
- 2013
- Building type
- Public building
- Role of DOTES
- Timber platform and larch facade cladding
Gallery
3Related