Timber construction
Machinery shed
Timber structure with trusses and stairs pre-assembled in our production facility.
Brief and solution
The project included workshop drawings, processing of the timber on an HMC and a CNC machine, and assembly of the structure on site.
For faster assembly, we pre-assembled the trusses and stairs in our production facility.
- Location
- Ribnica area
- Year
- 2024
- Building type
- Agricultural and ancillary
- Role of DOTES
- Workshop drawings, CNC processing and assembly
Gallery
6Related